Baltimore, MD - June 22 2023 - The Maryland Department of Transportation State Highway Administration (MDOT SHA) announced they have scheduled overnight ramp and lane closures within the I-95/I-695 interchange in southwestern Baltimore County from Sunday, June 25 through Friday, June 30.
MDOT SHA said, "the closures are required as part of the ongoing rehabilitation project for 10 bridges within the interchange."
Motorists can expect the following changes starting on Sunday, weather permitting, MDOT SHA said.
Overnight lane closures
- Northbound I-95 at I-695: Single-lane closures at 7 p.m., followed by double left-lane closures between 9 p.m. and 5 a.m. the next day, Sunday through Thursday, June 25-29. Overnight on Tuesday, there will be a triple left-lane closure between midnight and 5 a.m. Wednesday, June 28, to move construction work zone barriers and set a new traffic pattern in place.
- Southbound I-95 at I-695: Single-lane closures at 7 p.m., followed by double left-lane closures between 9 p.m. and 5 a.m. the next day, Sunday through Thursday, June 25-29. Overnight on Thursday, there will be a triple left-lane closure on southbound I-95 between midnight and 5 a.m. Friday, June 23, to move construction work zone barriers and set a new traffic pattern in place.
Overnight Ramp Closures
- Ramp from southbound I-95 to eastbound I-695 (outer loop): Closure and detour overnight, 8 p.m. to 5 a.m. the next day, Sunday through Thursday, June 25-29. A detour will be in place guiding motorists to exit onto Caton Avenue, proceed on southbound Caton Avenue, stay right to southbound US 1 Alt (Washington Boulevard), then take eastbound I-695 (outer loop).
- Ramp from northbound I-95 to westbound I-695 (inner loop): Closure and detour overnight, 8 p.m. to 5 a.m. the next day, Sunday through Thursday, June 25-29. A detour will be in place guiding motorists to exit onto Caton Avenue, go west on Caton Avenue, proceed to ramp to southbound I-95 and then take southbound I-95 to westbound I-695 (inner loop).
Daytime Lane Closures
- Sulphur Spring Road under I-95: Lane shifts and/or lane closures with flagging operations to control two-way traffic between 9 a.m. and 3 p.m. Monday through Friday, June 26-30.
For a full list of major State Highway Administration projects, go to their project portal or visit their website.